Customer Notice:
Please confirm the drawing parameters,confiquration specifications and other parameters carefully. If there is anymodification, pleasecontact customer service in time.(Once the drawing is confirmed and start production, no refund, noexchange )After the drawing is confirmed, no refund or exchange will be made after the order is placed and under theproduction line.If you have any questions, please contact customer service.
Installation and maintenance
1.The front-level power supply must be cut off before installation and maintenance 2. Pass the incoming and outgoing cables through the rubber sealing ring,and use the gasket and pressing device to compress it to ensure the sealing and the cable does not understand the loose grounding requirements.
3. When repairing and disassembling, make sure that the anti-shock surface is not bumped or scratched, and the well is coated with 204-1 anti-rust oil.
4. The distribution box should be checked regularly during use,and it is strictly prohibited for non-professionals to open the cover for installation and maintenance
Use range
1. Used in hazardous locations in Zone 1 and Zone 2 1. Used in IA IB IC explosive gas environment 1. Used in the environment of T1-T6
1. Suitable for flammable dust environment 20/21/22 zone